CONSTRUCTION

Power of installation

Power of installation for reduction of the length of installation time

Large cost reduction due to the reduction of installation period.

Mobilizing an efficient construction method
and heavy machinery shortens the installation period.

UNIT KOUHO

[Safety Speedy Low-cost installation]

Unit installation method ''UNIT KOUHO'' [Installation period Forecasting, Inventory Management and Quality Management are made easy]

UNIT KOUHO
[Planning the installation period, managing the inventory of materials and quality management is easy.]

It is a groundbreaking installation method that allows no loss of productivity and is safe and efficient!

Benefits of the Unit Installation Method “UNIT KOUHO”
  • _ Skills are not required to assemble the mounting structure.
  • _ Alignment work is not required.
  • _ The moving range within the site is in the field is reduced, so there is no loss of productivity.
  • _ Planning the installation period is easy.
  • _ It is easy to manage the inventory of materials.
  • _ It is not affected by the weather and productivity increases as the units are assembled in a simple assembly factory. Productivity increases as the units are assembled in a simple assembly factory.
  • _ Quality management is easy.
  • _ It is safe to construct the installation safely as workers do not have to deal with heavy machinery.

SavannaTracker

[Easy Fast Low-cost Construction]

The Savanna Tracker[Easy / Fast / Low-cost installation]

SavannaTracker
[Standardizing using materials by developing new design registered in Design Registrations.]

Realization of easy, fast and low-cost construction without heavy machinery!

Benefits of the Savanna Tracker
  • _ Units are assembled about 80 % in a simple assembly factory. It takes 20 minutes to install without heavy machinery!

Heavy machinery for solar power plants

[Improving installation efficiency]

Unique heavy machinery

GIGA Solar handles many kinds of heavy machinery for power plants for further improving installation efficiency.

Model Name
  • _ Giga RC Pocket Lift(GS-RCP001) picture at left
  • _ Giga RC Multi-Cutter(GS-RCM001)
  • _ Giga Screw Driver(GS-SD001)
  • _ Giga RC Marking Machine(GS-RM001)
  • _ Giga Crawler Deck(GS-CD001)

Power Station
[Installing string inverters at the same point]

Power Station where the distributed PCS can be installed in a concentrated manner.
Power Station where the distributed PCS can be installed in a concentrated manner

Power Station
[We can handle any maker inverters]

Choosing string inverters are spreading when constructing solar power plants because of taking into doing maintenance and decreasing power transmission loss and risk.
PCS station is made from aluminum and stainless steel with high durability and can be available both screw pilling and concrete foundation.