CONSTRUCTION

Power of installation

for reduction of the length of installation time

Reducing installation time leads
to significant cost reductions.

Gigasolar proposes plans to
reduce installation times

by implementing
its original heavy machinery
for UNIT KOUHO and for maintaining power plants.

Unit installation method ”UNIT KOUHO”

[Safety / Speedy / Low-cost installation]

Unit installation method ''UNIT KOUHO'' [Installation period Forecasting, Inventory Management and Quality Management are made easy]

UNIT KOUHO
[Installation period Forecasting, Inventory Management and Quality Management are made easy]

It is a groundbreaking installation method that allows no loss of productivity and is safe and efficient!

Benefits of the Unit Installation Method “UNIT KOUHO”
  • – Skills are not required to assemble the mount.
  • – Alignment work is not required.
  • – The moving range within the site is in the field is reduced, so there is no loss of productivity.
  • – Planning the installation period is easy.
  • – It is easy to manage the inventory of materials.
  • – It is not affected by the weather and productivity increases as the units are assembled in a simple assembly factory.
  • – Productivity increases as the units are assembled in a simple assembly factory.
  • – Quality management is easy.
  • – It is safe to construct the installation safely as workers do not have to deal with heavy machinery.

The Savanna Tracker
[Easy / Fast / Low-cost installation]

The Savanna Tracker[Easy / Fast / Low-cost installation]

The Savanna Tracker
[Standardizing parts to be used by implementing new developments according to the registered design]

We have realized simple and speedy installation methods at a lower cost without a need for heavy machinery!

Benefits of the Savanna Tracker
  • – Because 80% is preassembled in a factory, intallation is easy!
  • – It takes approximately 20 minutes to complete installation!
  • – No need to use heavy machinery!

Introduction of the heavy machinery for power plants
[For further improving installation efficiency]

The heavy machinery

Gigasolar handles many kinds of heavy machinery for power stations for further improving installation efficiency.

Name of The heavy machinery (Model No.)
  • – Giga Multi-Crawler(GS-CH001) Photo on the leftPhoto on the top:
  • – Giga RC Marking Machine(GS-RMM001)
  • – Giga Crawler Deck(GS-CD001)
  • – Giga Screw Driver(GS-SD001)

A power station
where the distributed PCS can be installed in a concentrated manner.

Power Station where the distributed PCS can be installed in a concentrated manner.
Power Station where the distributed PCS can be installed in a concentrated manner

Power Station
[All PCS companies can offer support]

Now, the choice of distributed power station conditioner is becoming more popular in consideration for rationality, power transmission losses and reduction of maintenance risks at power plants.
The highly durable aluminum and stainless steel materials are adopted to comply with the screw and concrete foundations.