Project

Project

Based on our rich construction experience, we can design power plants which are optimal for areas with heavy snowfalls and even high temperatures and humidity.

For example, we have constructed a power plant able to withstand 2 meters of snow in Hokkaido. In Okinawa, power stations need to be able to resist typhoons with wind velocities of 70 m/s and not brake down. At Gigasolar, we have construction experience backed by the strengths of our design and construction technologies suitable for snowy as well as for hot and humid regions and any type of terrain and climate.

We will construct newest large-scale power stations making the most of our comprehensive strength of Gigasolar! Overseas projects are also under way in 4 countries across the world!

Construction Example

  • 茨城県ひたちなか市

    Hitachinaka City, Ibaraki Prefecture

    Power Output
    330kW (Low pressure Split)
    Module
    Up Solar Japan
    Power Conditioner
    Omron
    Construction Methods
    Earth screw method
  • Ishigaki Island, Okinawa Prefecture

    Ishigaki Island, Okinawa Prefecture

    Power Output
    2MW
    Module
    Up Solar Japan
    Power Conditioner
    ABB
    Construction Methods
    Earth screw method
  • Inzai City, Chiba Prefecture

    Inzai City, Chiba Prefecture

    Power Output
    1MW
    Module
    Solar Frontier
    Power Conditioner
    ABB
    Construction Methods
    Earth screw method
  • Fujioka City, Gunma Prefecture

    Fujioka City, Gunma Prefecture

    Power Output
    2MW
    Module
    ReneSola
    Power Conditioner
    KACO
    Construction Methods
    Earth screw method
  • 栃木県壬生町

    Mibu-Cho, Tochigi Prefecture

    Power Output
    500kW
    Module
    Up Solar Japan
    Power Conditioner
    ABB
    Construction Methods
    Earth screw method
  • Hokota City, Ibaraki Prefecture

    Hokota City, Ibaraki Prefecture

    Power Output
    750kW (Low pressure Split)
    Module
    Up Solar Japan
    Power Conditioner
    Omron
    Construction Methods
    Earth screw method
  • Urayasu City, Chiba Prefecture

    Urayasu City, Chiba Prefecture

    Power Output
    50kW
    Module
    Up Solar Japan
    Power Conditioner
    Omron
    Construction Methods
    Folded plate roof construction method
  • Fujisawa City, Kanagawa Prefecture

    Fujisawa City, Kanagawa Prefecture

    Power Output
    36kW
    Module
    Up Solar Japan
    Power Conditioner
    Omron
    Construction Methods
    Land roof gravity feed method

Overseas Projects

ChinaChina

Many Partner Companies

The project is under way to propose an off grid plan to factories.

MalaysiaMalaysia

Participating at exhibitions

Starting negotiations with governments towards construction of power plants.

IndonesiaIndonesia

Independent solar power plants

We have many business inquiries for off grid EPC.

CambodiaCambodia

Light up in Cambodia

A lifeline power plant project is under way.